Metro Line 3 Maciachini-Comasina
“Milano Massivo” superstructure has been realised in order to dampen noise and vibration and to reduce maintenance at most. The track (7,4 km) runs entirely in tunnel. In order to solve some problems related to the vehicle envelope, the height of the system has been reduced.